Phoenix

In Phoenix, three types of concrete buildings showed cost savings of more than 5% in heating and cooling costs compared to the baseline building: pre-cast concrete exceeding code with either structural steel framing (5/2%) or with reinforced concrete structural system, floors, and interior walls (very high mass) (8.6%), and very high mass buildings with internal loads clustered near the central core of the building (7.8%). Concrete buildings without extra insulation performed more poorly than the baseline building. Click Here to read the full article.

Energy Cost Savings Reduction for Commercial Construction Types in Phoenix, Arizona


Cost Savings (percent)
Scenario
Annual Electrical and Fuel Costs (US Dollors)
Compared To Similar Building, %
Compared To Similar Building, Excluding Receptacle Loads, %
Compared to EL, %
Compared To EL Excluding Receptacle Loads, %
EL (baseline)
$66,335
0.0
0.0
0.0
0.0
CL
$66,762
0.0
0.0
-0.6
-0.8
ML
$70,223
0.0
0.0
-5.9
-7.0
EM
$63,909
3.7
4.4
3.7
4.4
CM
$64,388
3.6
4.3
2.9
3.5
MM
$67,519
3.9
4.6
-1.8
-2.1
MLX
$62,917
10.4
12.4
5.2
6.2
MMX
$60,653
13.6
16.2
8.6
10.3
MMI
$68,354
2.7
3.2
-3.0
-3.7
MMXI
$61,183
12.9
15.3
7.8
9.3



Yearly energy use






Savings as a percent of the building






Savings as a percent of the building except receptacle loads