In Denver, all concrete scenarios produced heating and cooling energy cost savings relative to the baseline building. Except for the structural steel building, adding concrete to the interior or exterior of a building insulated to code produced heating and cooling cost savings of about 8% compared to the baseline building. Adding more mass or more insulation or both resulted in additional cost savings up to about 20% for the very high mass building with extra insulation and distributed internal loads. Click Here to read the full article.

Energy Cost Savings Reduction for Commercial Construction Types in Denver, Colorado


Cost Savings (percent)
Scenario
Annual Electrical and Fuel Costs (US Dollors)
Compared To Similar Building, %
Compared To Similar Building, Excluding Receptacle Loads, %
Compared to EL, %
Compared To EL Excluding Receptacle Loads, %
EL (baseline)
$51,947
0.0
0.0
0.0
0.0
CL
$51,771
0.0
0.0
0.3
0.4
ML
$51,411
0.0
0.0
1.0
1.3
EM
$48,093
7.4
9.1
7.4
9.1
CM
$48,008
7.3
9.0
7.6
9.3
MM
$47,792
7.0
8.7
8.0
9.8
MLX
$44,079
14.3
17.6
15.1
18.6
MMX
$41,729
18.8
23.2
19.7
24.2
MMI
$48,793
5.1
6.3
6.1
7.5
MMXI
$42,354
17.6
21.7
18.5
22.7



Yearly energy use






Savings as a percent of the building






Savings as a percent of the building except receptacle loads